Our Cold Room Installation Process
-
Consultation and Assessment.
-
Design and Planning.
-
Procurement of Materials.
-
Installation.
-
Testing and Commissioning.
Cold room construction will begin with assessing the specific storage requirements of the intended products. Factors such as the required temperature range, humidity levels, and overall storage capacity will all need to be taken into account
Once the design process has been completed, construction will usually begin with the installation of the insulated panels that form the walls, floors, and ceilings of the cold room. The panels are typically constructed using materials with high thermal resistance to minimize heat transfer and maintain stable internal temperature.